Full Scale Testing /center/ciest/ en Part of ARPA-E Project: Rapid Encapsulation of Pipelines Avoiding Intensive Replacement (REPAIR) /center/ciest/REPAIR-TA <span>Part of ARPA-E Project: Rapid Encapsulation of Pipelines Avoiding Intensive Replacement (REPAIR)</span> <span><span>Jonah Cooke</span></span> <span><time datetime="2024-10-15T09:58:48-06:00" title="Tuesday, October 15, 2024 - 09:58">Tue, 10/15/2024 - 09:58</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/2025-12/arpa.e.png?h=69f000c0&amp;itok=HQc7KYKd" width="1200" height="800" alt="arpa.e."> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/120" hreflang="en">Lifeline Systems</a> <a href="/center/ciest/taxonomy/term/129" hreflang="en">Pipeline Repair</a> <a href="/center/ciest/taxonomy/term/115" hreflang="en">Projects</a> <a href="/center/ciest/taxonomy/term/97" hreflang="en">Reports</a> <a href="/center/ciest/taxonomy/term/14" hreflang="en">Research</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><h5><span><strong>Approach</strong></span></h5><p><span>U.S. Department of Energy–supported, 3-year, multi-million-dollar project focused on gas distribution mains. The approach automates construction of a regulation-compliant, stand-alone internal replacement pipe (IRP) inside legacy mains using trenchless methods. It integrates smart structural coatings, new integrity/inspection tools, and 3D geospatial maps combining pipeline, adjacent-utility, leak, and coating-deposition data. A performance-based framework is used to establish pipe-replacement criteria and to validate a 50-year design life for IRP systems.</span></p><h5><span><strong>Results</strong></span></h5><p><span>A validated design basis demonstrates a 50-year design life for innovative IRP systems that do not rely on the host pipe. Clear performance criteria and acceptance thresholds for pipe replacement are established to meet utility and regulatory requirements. Prototypes and test datasets are produced for smart coatings, integrity/inspection tools, and integrated 3D mapping of mains and nearby infrastructure. Progress is shown toward a total cost target of $0.5–$1.0M per mile, inclusive of service disruptions.</span></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="field_media_oembed_video"><iframe src="/center/ciest/media/oembed?url=https%3A//www.youtube.com/watch%3Fv%3Dffk0b2zSqR4&amp;max_width=516&amp;max_height=350&amp;hash=o1hJ2IwoUMy7CI3bqJr62JMMuSrd6X6-raK-PIXRWmQ" width="516" height="290" class="media-oembed-content" loading="eager" title="REPAIR Testing and Analysis"></iframe> </div> </div> </div> </div> </div> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><h5><span><strong>Implications</strong></span></h5><p><span>Utilities can rehabilitate leak-prone legacy mains faster and with less excavation, reducing methane emissions and improving public safety. The performance criteria provide a repeatable, standards-ready pathway to specify and qualify IRP technologies across projects. Smart coatings and integrated mapping enhance long-term monitoring, risk prioritization, and lifecycle asset management. Achieving the cost target supports large-scale deployment and accelerates backlog reduction nationwide.</span></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/2024-10/tarp.png?itok=lvUGQ5bt" width="1500" height="800" alt="Pipe_setup_cropped"> </div> </div> </div> </div> </div> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> <div><div class="row ucb-column-container"><div class="col ucb-column"> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/2025-11/repair%20table.png?itok=ISodn95O" width="1500" height="1010" alt="repair project table"> </div> </div><div class="col ucb-column"> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/2025-11/repair%20project.png?itok=-SlFu_FM" width="1500" height="1011" alt="repair project"> </div> </div></div></div> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><h5>&nbsp;</h5><h3><span>Project Team</span></h3><p><strong>Primary Investigator:</strong></p> <div class="imageMediaStyle square_thumbnail_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/square_thumbnail_image_style/public/people/dashtiportraits-2_0.jpg?h=9294e969&amp;itok=a1crmduq" width="100" height="100" alt> </div> <p><a href="/center/ciest/BradParkerWham" data-entity-type="node" data-entity-uuid="a774b224-0028-46fc-94ee-35d232cc371d" data-entity-substitution="canonical" rel="nofollow" title="Brad Parker Wham">Brad Parker Wham</a></p> <div class="imageMediaStyle square_thumbnail_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/square_thumbnail_image_style/public/people/shideh-dashti-crop.jpg?h=9f316635&amp;itok=9XcClAYM" width="100" height="100" alt> </div> <p><a href="/center/ciest/Shideh-Dashti" data-entity-type="node" data-entity-uuid="bea95a26-1010-4b59-928d-8d80bab8bdb0" data-entity-substitution="canonical" rel="nofollow" title="Shideh Dashti">Shideh Dashti</a></p> <div class="imageMediaStyle square_thumbnail_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/square_thumbnail_image_style/public/2025-11/Mija%20Hubler.jpg?h=6f386a74&amp;itok=ZIkfaKCf" width="100" height="100" alt="Mija Hubler"> </div> <p><a href="/center/ciest/MijaHubler" data-entity-type="node" data-entity-uuid="b65f5d00-c03c-453d-a664-3eee44f6b2a8" data-entity-substitution="canonical" rel="nofollow" title="Mija Hubler">Mija Hubler</a></p><p><span><strong>CIEST Personnel:</strong> Patrick Dixon, John Hindman,&nbsp;Davis Holt, &nbsp;Cory Ihnotic, Katherine O'Dell, Kent Polkinghorne, Dustin Quandt, Yao Wang</span><br><strong>Graduate Researchers:</strong><span> Jacob Klingaman, Sina Senji, Molly Sickler, Deeptesh Pawaskar</span><br><strong>Undergraduate Researchers: </strong><span>Jonah Cook, William Flood, Coen Hines, Alyssa McCarthy, </span><span lang="PL">Ketan Kamat, </span><span>Daniel Mascarenas, Samuel Mohnacs</span></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> </div> </div> </div> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><h3><strong>Project Deliverables &amp; Reports:</strong></h3><ul><li><a href="https://o365coloradoedu.sharepoint.com/sites/REPAIR-REPAIRTandA_Public/Shared%20Documents/Forms/AllItems.aspx?id=%2Fsites%2FREPAIR%2DREPAIRTandA%5FPublic%2FShared%20Documents%2FIRPAnalyzer%5FVersion%5F2%2E1%2Eexe&amp;parent=%2Fsites%2FREPAIR%2DREPAIRTandA%5FPublic%2FShared%20Documents&amp;p=true&amp;ga=1" data-entity-type="external" rel="nofollow">IRP Analyzer Tool (free download)</a></li><li><a href="/center/ciest/sites/default/files/2025-07/AQUA-PIPE%20External%20Loading%20Report_FINAL.pdf" data-entity-type="external" rel="nofollow">Service Life Assessment of Internal Replacement Pipe</a></li><li><a href="/center/ciest/IMain-Testing-Report" data-entity-type="external" rel="nofollow">External Load Testing of Main Review</a></li></ul><p><a class="ucb-link-button ucb-link-button-gold ucb-link-button-default ucb-link-button-regular" href="https://arpa-e.energy.gov/programs-and-initiatives/view-all-programs/repair" rel="nofollow"><span class="ucb-link-button-contents">View ARPA-E's program description&nbsp;</span></a></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> </div> </div> </div> </div> </div> </div> </div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Tue, 15 Oct 2024 15:58:48 +0000 Jonah Cooke 313 at /center/ciest Evaluation of Gate Valve Flanges: Serrated vs Non-Serrated Under External Loading /center/ciest/2024/04/30/evaluation-gate-valve-flanges-serrated-vs-non-serrated <span>Evaluation of Gate Valve Flanges: Serrated vs Non-Serrated Under External Loading</span> <span><span>Anonymous (not verified)</span></span> <span><time datetime="2024-04-30T16:09:33-06:00" title="Tuesday, April 30, 2024 - 16:09">Tue, 04/30/2024 - 16:09</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/article-thumbnail/fail_2_web_edt.png?h=9282de24&amp;itok=5Q5vQCls" width="1200" height="800" alt="failure_2"> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/120" hreflang="en">Lifeline Systems</a> <a href="/center/ciest/taxonomy/term/141" hreflang="en">Materials Testing</a> <a href="/center/ciest/taxonomy/term/117" hreflang="en">Pipeline Systems</a> <a href="/center/ciest/taxonomy/term/14" hreflang="en">Research</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-image/failure_2_2.png?itok=FUqAsWH2" width="1500" height="843" alt="Fail_2"> </div> </div> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> <div><p><strong>Project Title:</strong> Evaluation of Gate Valve Flanges: Serrated vs Non-Serrated Under External Loading</p><p><strong>Industry Partners:</strong> Denver Water</p><p><strong>CIEST Personnel:</strong> Cory Ihnotic and Jessica Ramos</p><p><strong>Primary Investigator:</strong> Prof. Brad Wham</p><p><strong>Year:</strong> 2024</p><p>The intent of this study is to investigate the difference between a serrated faced flange connection and a non-serrated faced flange connection; mainly to determine whether one would leak sooner than the other. To evaluate this, a series of four-point bending tests with applied axial load were conducted on Mueller Resilient Wedge Gate Valves. The tested specimens were commercially available 6 in. (150 mm) diameter ductile iron pipe conforming to AWWA C600 standards, which were provided by Denver Water. Each type of flange connection (serrated or non-serrated) received two tests, each with displacement applied at a rate of 1 in. (25 mm) per minute. For the conducted tests, several points of interest were located including the site of the first and second leaks, and their respective leak rates to determine which of the connections had a more substantial failure.</p><p>Appreciation is extended to John Daly and Katie Ross, along with all our pipe and coupling manufacturers, for their tremendous support.</p><p><a class="ucb-link-button ucb-link-button-blue ucb-link-button-default ucb-link-button-regular" href="/center/ciest/sites/default/files/2025-03/240820%20DW-Serrated%20vs%20Nonserrated__Final%20Draft_v2.pdf" rel="nofollow"><span class="ucb-link-button-contents">Testing Report&nbsp;</span></a></p><p>Link to testing report: <a href="/center/ciest/sites/default/files/2025-03/240820%20DW-Serrated%20vs%20Nonserrated__Final%20Draft_v2.pdf" rel="nofollow">/center/ciest/sites/default/files/2025-03/240820%20DW-Serrated%20vs%20Nonserrated__Final%20Draft_v2.pdf</a></p></div> </div> </div> </div> </div> <div>The intent of this study is to investigate the difference between a serrated faced flange connection and a non-serrated faced flange connection; mainly to determine whether one would leak sooner than the other. </div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Tue, 30 Apr 2024 22:09:33 +0000 Anonymous 289 at /center/ciest Performance Assessment of iPVC Pipe and Coupling for Large Ground Movement /center/ciest/2022/11/15/performance-assessment-ipvc-pipe-and-coupling-large-ground-movement <span>Performance Assessment of iPVC Pipe and Coupling for Large Ground Movement </span> <span><span>Anonymous (not verified)</span></span> <span><time datetime="2022-11-15T00:00:00-07:00" title="Tuesday, November 15, 2022 - 00:00">Tue, 11/15/2022 - 00:00</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/article-thumbnail/20210524_092450.jpg?h=810ceda2&amp;itok=TqUd87YQ" width="1200" height="800" alt="pipe in bending frame"> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/120" hreflang="en">Lifeline Systems</a> <a href="/center/ciest/taxonomy/term/141" hreflang="en">Materials Testing</a> <a href="/center/ciest/taxonomy/term/117" hreflang="en">Pipeline Systems</a> <a href="/center/ciest/taxonomy/term/97" hreflang="en">Reports</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="field_media_oembed_video"><iframe src="/center/ciest/media/oembed?url=https%3A//www.youtube.com/watch%3Fv%3D1P1IiLPyCPk%26ab_channel%3DCU¶¶Òõ´«Ã½ÔÚÏßCIEST&amp;max_width=516&amp;max_height=350&amp;hash=QCVzOwmWsBHgUGe6noMhQR_IPhWqlaI5JoO3aCaS2zE" width="516" height="290" class="media-oembed-content" loading="eager" title="PT30 Earthquake Testing of PVC Pipe"></iframe> </div> </div> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><p><strong>Project Title:</strong> Performance Assessment of iPVC Pipe and Coupling for Large Ground Movement&nbsp;</p><p><strong>Industry Partners:</strong> East Bay Municipal Utility District, Denver Water&nbsp;</p><p><strong>CIEST Personnel:</strong>&nbsp;Nicholas Berty, Cory Ihnotic, Katherine O’Dell, Jessica Ramos</p><p><strong>Primary Investigator:</strong>&nbsp;Prof. Brad Wham&nbsp;</p><p><strong>Year:</strong>&nbsp;2022&nbsp;</p><p><strong>Project Summary:</strong>&nbsp;The intent of this study is to define the seismic response of iPVC pipeline systems with couplings and to illustrate procedures for interpreting laboratory results to seismically classify pipeline system performance following developing ASCE seismic guidelines. Twenty large-scale tests were performed on 6-in. diameter DR14 (PC305) iPVC pipe (C900) with five different commercially available reinforced connections. Test specimens were subjected to tension, compression, cyclic, and four point bending tests, determining the ultimate load capacity for each system in both axial and transverse directions. This study provides the first seismic classification for plastic pipe systems with reinforced connections.&nbsp;</p><p>Appreciation is extended to David Katzev and Katie Ross, along with all our pipe and coupling manufacturers, for their tremendous support.&nbsp;</p><p><a href="/center/ciest/sites/default/files/attached-files/performance_assessment_of_ipvc_pipe_and_couplings_v1.1.pdf" rel="nofollow"><strong>Link to Report</strong></a></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-image/file_005.jpeg?itok=E9L51tdn" width="1500" height="1125" alt="overview"> </div> </div> </div> </div> </div> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 1"> <div class="ucb-article-text" itemprop="articleBody"> <div><div class="row ucb-column-container"><div class="col ucb-column"> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-thumbnail/20210524_092450.jpg?itok=Xjf74z4G" width="1500" height="1125" alt="pipe in bending frame"> </div> </div><div class="col ucb-column"> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-image/img_20210915_144300.jpg?itok=bFeQp8bA" width="1500" height="1125" alt="broken joint"> </div> </div></div></div> </div> </div> </div> </div> <div>The intent of this study is to define the seismic response of iPVC pipeline systems with couplings and to illustrate procedures for interpreting laboratory results to seismically classify pipeline system performance following developing ASCE seismic guidelines.</div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Tue, 15 Nov 2022 07:00:00 +0000 Anonymous 274 at /center/ciest Seismic Evaluation of Hazard-Resistant Lifelines: Fusible PVC Pipe and Fittings /center/ciest/seismic-evaluation-fusible-pvc-pipe-and-fittings <span>Seismic Evaluation of Hazard-Resistant Lifelines: Fusible PVC Pipe and Fittings</span> <span><span>Brad Wham</span></span> <span><time datetime="2021-07-18T11:03:45-06:00" title="Sunday, July 18, 2021 - 11:03">Sun, 07/18/2021 - 11:03</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/article-thumbnail/img_4437.jpg?h=37d605da&amp;itok=uKBZkc2e" width="1200" height="800" alt="thumbafter"> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/120" hreflang="en">Lifeline Systems</a> <a href="/center/ciest/taxonomy/term/117" hreflang="en">Pipeline Systems</a> <a href="/center/ciest/taxonomy/term/115" hreflang="en">Projects</a> <a href="/center/ciest/taxonomy/term/97" hreflang="en">Reports</a> <a href="/center/ciest/taxonomy/term/14" hreflang="en">Research</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-image/halfway_1.png?itok=71CVDSf5" width="1500" height="455" alt="half"> </div> </div> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> <div><p><strong>Project Title:</strong>&nbsp; Seismic Evaluation of Hazard-Resistant Lifelines: Fusible PVC Pipe and Fittings</p><p><strong>Industry Partners:</strong> Aegion Corportation - Underground Solutions Inc.&nbsp;</p><p><strong>CIEST Personnel:</strong>&nbsp;Cory Ihnotic,&nbsp; Jessica Ramos, D.K Anderson, David Balcells</p><p><strong>Primary Investigator:</strong>&nbsp;Prof. Brad Wham&nbsp;</p><p><strong>Year:</strong>&nbsp;2021</p><p><strong>Project Summary:</strong>&nbsp;The intent of this study is to impose external loading conditions to test specimens that are representative of the significant deformations possible during earthquake-induced ground motions such as landsliding, fault rupture, and liquefaction-induced lateral spreading, characterizing the pipeline system capacity. This testing program seeks to define the seismic response of fusible PVC (fPVC) pipeline systems with both fused connections and external couplings, illustrating procedures and best practices for conducting full-scale tests and interpreting laboratory results. Thirteen large-scale tests were performed on 6-in. diameter DR18 (PC235) fusible PVC pipe (C900) with three different connection types. Test specimens were subjected to tension, compression, cyclic, and four point bending tests, determining the ultimate load capacity for each system in both axial and transverse directions.&nbsp;</p><p>Link to report: <a href="/center/ciest/sites/default/files/attached-files/240724_ciest-ugs_fusible_report_to_be_published.pdf" rel="nofollow"><strong>/center/ciest/sites/default/files/attached-files/240724_ciest-ugs_fusible_report_to_be_published.pdf</strong></a></p><p>&nbsp;</p><p>&nbsp;</p></div> </div> </div> </div> </div> <div>The intent of this study is to impose external loading conditions to test specimens that are representative of the significant deformations possible during earthquake-induced ground motions such as landsliding, fault rupture, and liquefaction-induced lateral spreading, characterizing the pipeline system capacity.</div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Sun, 18 Jul 2021 17:03:45 +0000 Brad Wham 308 at /center/ciest Axial Capacity of Reinforced Gasketed Joints /center/ciest/2020/09/30/axial-capacity-reinforced-gasketed-joints <span>Axial Capacity of Reinforced Gasketed Joints</span> <span><span>Anonymous (not verified)</span></span> <span><time datetime="2020-09-30T00:00:00-06:00" title="Wednesday, September 30, 2020 - 00:00">Wed, 09/30/2020 - 00:00</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/article-thumbnail/dw_thumbnail_0.png?h=cd6055e2&amp;itok=3rb_m8hK" width="1200" height="800" alt="Fully seated gasket"> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/120" hreflang="en">Lifeline Systems</a> <a href="/center/ciest/taxonomy/term/130" hreflang="en">PVC Pipe</a> <a href="/center/ciest/taxonomy/term/117" hreflang="en">Pipeline Systems</a> <a href="/center/ciest/taxonomy/term/97" hreflang="en">Reports</a> <a href="/center/ciest/taxonomy/term/14" hreflang="en">Research</a> <a href="/center/ciest/taxonomy/term/22" hreflang="en">Structures</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="field_media_oembed_video"><iframe src="/center/ciest/media/oembed?url=https%3A//www.youtube.com/watch%3Fv%3DqUB-YhOMdtc&amp;max_width=516&amp;max_height=350&amp;hash=-Q0CDAPf1e-ORUjUn7QcAJiLIsrWNUbp7tyiLJqzgko" width="516" height="290" class="media-oembed-content" loading="eager" title="Cyclic Axial Testing of Bell-Spigot PVC Pipe"></iframe> </div> </div> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> </div> </div> </div> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default 3"> <div class="ucb-article-row-subrow row"> <div class="ucb-article-text col-lg d-flex align-items-center" itemprop="articleBody"> <div><p><strong>Full Project Title:&nbsp;</strong>Axial Capacity&nbsp;of C900 PVC Pipe with Reinforced Gasketed Joints</p><p><strong>Year:&nbsp;</strong>2019-20</p><p><strong>Industry Partner:&nbsp;</strong>Denver Water</p><p><strong>CIEST Personnel:&nbsp;</strong>Jessica Ramos, John Hindman, Brice Lucero, David Ballcells, Hayley Parnell, and Porter Hawkins</p><p><strong>Primary Investigator: </strong>Prof. Brad Wham</p><p><strong>Summary:</strong>&nbsp;The objective of this study was to impose externally applied axial loading to reinforced gasketed water pipeline joints to establish upper bound performance under worst case conditions of ground movement.&nbsp; Test protocols included axial tension and cyclic (progressive tension and compression) loading on bell-spigot style C900 PVC pipe to simulate deformations possible during natural hazards such as earthquakes and landslides . The test specimens consisted of either RieberLok Gasketed or Diamond Lok-21 pipe with a restraining ring. Tests provided measures of axial displacement capacity, pipeline connection strength, and failure mechanism. The results indicated these systems as potentially viable solutions for regions prone to persistent soil movement and settlement. Tests were conducted in partnership with Denver Water.</p><p>Failed specimen after testing in tension.</p><p><strong>View the full report </strong><a href="/center/ciest/media/9" rel="nofollow"><strong>here</strong></a><strong>.</strong></p></div> </div> <div class="ucb-article-content-media ucb-article-content-media-right col-lg"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="imageMediaStyle large_image_style"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/large_image_style/public/article-image/dwpt17.png?itok=pVRd0B06" width="1500" height="522" alt="Denver water axial tension test specimen set up."> </div> </div> </div> </div> </div> </div> </div> </div> </div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Wed, 30 Sep 2020 06:00:00 +0000 Anonymous 229 at /center/ciest Tension Testing of Flexible Expansion Joints /center/ciest/2020/07/19/tension-testing-flexible-expansion-joints <span>Tension Testing of Flexible Expansion Joints</span> <span><span>Anonymous (not verified)</span></span> <span><time datetime="2020-07-19T12:26:52-06:00" title="Sunday, July 19, 2020 - 12:26">Sun, 07/19/2020 - 12:26</time> </span> <div> <div class="imageMediaStyle focal_image_wide"> <img loading="lazy" src="/center/ciest/sites/default/files/styles/focal_image_wide/public/article-thumbnail/img_1977.jpg?h=9f6463aa&amp;itok=d93eU5hA" width="1200" height="800" alt="Axial set up of FEJ specimen"> </div> </div> <div role="contentinfo" class="container ucb-article-categories" itemprop="about"> <span class="visually-hidden">Categories:</span> <div class="ucb-article-category-icon" aria-hidden="true"> <i class="fa-solid fa-folder-open"></i> </div> <a href="/center/ciest/taxonomy/term/137"> Materials Testing </a> <a href="/center/ciest/taxonomy/term/12"> Projects </a> </div> <div role="contentinfo" class="container ucb-article-tags" itemprop="keywords"> <span class="visually-hidden">Tags:</span> <div class="ucb-article-tag-icon" aria-hidden="true"> <i class="fa-solid fa-tags"></i> </div> <a href="/center/ciest/taxonomy/term/121" hreflang="en">Full Scale Testing</a> <a href="/center/ciest/taxonomy/term/117" hreflang="en">Pipeline Systems</a> <a href="/center/ciest/taxonomy/term/97" hreflang="en">Reports</a> <a href="/center/ciest/taxonomy/term/14" hreflang="en">Research</a> <a href="/center/ciest/taxonomy/term/22" hreflang="en">Structures</a> </div> <div class="ucb-article-content ucb-striped-content"> <div class="container"> <div class="paragraph paragraph--type--article-content paragraph--view-mode--default"> <div class="ucb-article-content-media ucb-article-content-media-above"> <div> <div class="paragraph paragraph--type--media paragraph--view-mode--default"> <div> <div class="field_media_oembed_video"><iframe src="/center/ciest/media/oembed?url=https%3A//www.youtube.com/watch%3Fv%3DaMiMGiOqKZI&amp;max_width=516&amp;max_height=350&amp;hash=z1Tl-CCvJPYimQ9qiB8t8FlNt7S_QR2Av_vg6_95toE" width="516" height="290" class="media-oembed-content" loading="eager" title="Flex-tend Flexible Expansion Joint Axial Testing"></iframe> </div> </div> </div> </div> </div> <div class="ucb-article-text d-flex align-items-center" itemprop="articleBody"> <div><p><strong>Project Title:</strong>&nbsp;Tension Testing of Flexible Expansion Joints &nbsp;</p><p><strong>Industry Partners:</strong> EBAA Iron, Inc.&nbsp;</p><p><strong>CIEST Personnel:</strong>&nbsp;Hailey Parnell, Lindsay Guerrero, Bruce Lucero</p><p><strong>Primary Investigator:</strong>&nbsp;Prof. Brad Wham&nbsp;</p><p><strong>Year:</strong>&nbsp;2020&nbsp;</p><p><strong>Project Summary:</strong>&nbsp;&nbsp;The intent of the test program is to&nbsp;investigate&nbsp;the axial performance of a Flex-Tend Flexible Expansion Joint (FEJ) and a Force-Balanced FlexTend Flexible Expansion Joint (FBFEJ), each nominally 6-in. diameter. Externally applied axial tension load test results are compared to data obtained from internal pressure burst tests and demonstrate that, while similar levels of axial force are required to initiate component failure, the failure mechanisms differ and and influenced by the circumferential stress supplied during burst testing. The work was undertaken in the Center for Infrastructure, Energy, and Space Testing (CIEST) which is affiliated with the Civil, Environmental, and Architectural Engineering Department at the ¶¶Òõ´«Ã½ÔÚÏß. &nbsp;</p><p>Follow this link for the&nbsp;<a href="/center/ciest/media/10" rel="nofollow"><strong>Report</strong></a><strong> </strong>by H.L. Parnell, L. Guerrero, B.A. Lucero, and B.P. Wham.</p><p><a class="ucb-link-button ucb-link-button-blue ucb-link-button-default ucb-link-button-regular" href="/center/ciest/media/10" rel="nofollow"><span class="ucb-link-button-contents">Testing Report</span></a></p><p>&nbsp;</p></div> </div> </div> </div> </div> <div>Report by H.L. Parnell, L. Guerrero, B.A. Lucero, and B.P. Wham.</div> <h2> <div class="paragraph paragraph--type--ucb-related-articles-block paragraph--view-mode--default"> <div>Off</div> </div> </h2> <div>Traditional</div> <div>0</div> <div>On</div> <div>White</div> Sun, 19 Jul 2020 18:26:52 +0000 Anonymous 249 at /center/ciest